FBR registered · verify Manufactured in Sialkot, Pakistan

Buyer guide

How to Compare Clothing Manufacturer Quotations, Line by Line

Written by Abdul Hadi · last reviewed

To compare clothing manufacturer quotations, put every quote on the same lines: the terms, what is being made, the price per piece, and the cost after the factory price (shipping, duty and tax). A quote is only comparable once each line has an answer. Where a quote is silent, ask. A blank line is a question, not a zero.

Key takeaway. Compare quotes only after they describe the same garment, the same quantity and the same delivery basis. Then compare the landed cost per piece, not the headline price. A quote that looks cheaper is not cheaper if it leaves out something you will have to pay for later.

Want a quote you can set beside another? Send your brief and we reply with pricing and a sample timeline. Sample: 8–10 working days. Bulk: 15–18 working days after you approve the sample. Shipping is extra.

What makes two quotes comparable?

Our cost factors guide covers the first half: sending every supplier the same brief. This guide covers the second half: reading what comes back. Quotes line up when all of these match:

  • The same garment. The same fabric type and weight, the same construction, the same decoration positions and the same size run. See our GSM guide for why weight matters.
  • The same quantity. Prices can change with quantity, and minimums are counted per style. Ask every supplier to quote the same number.
  • The same delivery basis. A price that stops at the factory door and a price delivered to you are different things. Our Incoterms guide explains the terms.
  • The same currency. Convert before you compare, and write down the rate and the date.

What should you read on every line of a quote?

The lines of a quote, what to read, and what to ask when it is missing
LineWhat to readAsk if it is missing
SpecificationFabric, weight, construction, decoration method and positions, size range.Please confirm the fabric, the weight and the decoration positions in writing.
Quantity and minimumThe quantity quoted, and whether the minimum is per style or per order.Is the minimum counted per style? What happens below it?
Price linesGarment, decoration, trims, labels, packaging, and any one-off setup charge.Which of these are included in the price per piece, and which are extra?
Currency and validityThe currency, and the date until which the quote holds.In which currency is the quote, and until when is it valid?
Sample termsWhether a sample is available, its fee, whether the fee is credited later, and the time.What does the sample cost, and is the fee credited against a bulk order?
Lead timesWhether the days are working or calendar days, and which event starts the clock.Are these working or calendar days, and from which date do they count?
Payment termsThe deposit, the balance, when each is due, and the account name.What is due when? Is the account in the registered business name?
Delivery basisThe Incoterm and the named place, and who is importer of record.Which term applies, to which place, and who clears the goods?
Quality and remedyWhether you can inspect, and what happens to faulty units.Can I inspect before shipment, and is the remedy for faulty units in writing?

Our quote comparison worksheet has a column for each supplier and a row for every line above. It also adds the price per piece, the landed cost, and counts the lines a supplier has not answered. It contains no prices: you copy every figure from your own quotes.

How do you compare the totals?

  1. Fill the same table for every quote. One column per supplier, one row per line.
  2. Mark the blanks. Count them. A quote with many blanks is not ready to compare.
  3. Ask for the missing lines in writing, and put the answers in the table with the date.
  4. Work out the price per piece. Add every per-piece line, then spread any one-off charge over the quantity.
  5. Add what comes after the factory price: shipping, insurance, duty, tax and brokerage. Our landed cost guide shows how, and it points to the official pages to use. Do not take a duty figure from a supplier.
  6. Compare the landed cost per piece, then read the terms and the answers. The cheapest figure is the start of the decision, not the end of it.

What can make a cheaper quote not cheaper?

  • A different fabric. A lighter weight or a different composition can look the same in a photo and feel different in hand.
  • Left out lines. Labels, hangtags, polybags, cartons, or a setup charge that appears later.
  • Fewer decoration positions, or a simpler method than the one you asked for.
  • A sample fee that is not credited, or a sample that is free but whose terms are unclear.
  • A different minimum. A minimum per order is not the same as a minimum per style.
  • A delivery basis that stops earlier. The factory price plus your own freight and charges is the number to compare.
  • Calendar days against working days. A lead time in calendar days is not the same as the same number in working days. Our timeline estimator counts working days.

What are the red flags in a quote?

  • One lump sum with no breakdown, and no willingness to explain it.
  • A price far below every other quote, with no explanation of what is left out.
  • A minimum or a lead time that differs between the website, the quote and the messages.
  • Bank details that arrive in a chat message, or an account that is not in the registered business name. Our payment guide covers what to put in writing.
  • Pressure to pay before the terms are written down.

Score each supplier on our supplier scorecard alongside the quote. The quote shows the price. The scorecard shows what you could check.

How do you choose between two close quotes?

When the landed costs are close, stop comparing numbers. A paid sample from each shortlisted supplier shows the real fabric, stitching and decoration, and how the supplier answers questions. Our sample stages guide explains what to check at each stage, and our quality check guide explains how to inspect it. Then decide on the sample, the written answers and the terms.

How do our quotes read?

Pricing is by quote only, and we publish no prices. These are the confirmed terms you can hold any quote from us against:

  • The minimum is 20 pieces per style per color. A team kit order can start from one team set of 15 kits.
  • A sample can be a single piece, paid in advance. The fee is credited against a first bulk order of 50 or more pieces.
  • A sample takes 8–10 working days. Bulk takes 15–18 working days after you approve the sample. Shipping is extra.
  • Bulk starts with a 50% deposit, and the balance is due before shipment.
  • We ship worldwide, and the buyer is the importer of record.

If a line is missing from any quote, ours included, ask. Our process page shows the stages, and the same worksheet works for us as for any other supplier.

This guide is general information for buyers, not legal, tax or customs advice. It was reviewed on 14 November 2026.

Common Questions

How many quotes should I compare?

Two or three is enough for most first orders. More quotes mean more questions to answer and more blanks to chase, and the comparison gets harder rather than better. Send each supplier the same brief and compare only the quotes that answer every line.

Is the lowest quote the best one?

Not automatically. A low quote can leave out labels, packaging, decoration positions, a sample fee or shipping, or describe a lighter fabric. Compare the landed cost per piece with the same specification, then read the terms and the answers to your questions before you decide.

What should I do when a quote leaves out a line?

Treat a blank as a question, not as zero. Ask the supplier in writing and wait for the answer before you compare. If a supplier will not say what is included, that is useful information too.

Can a paid sample help me choose between two quotes?

Yes. A paid sample from each shortlisted supplier shows the real fabric, stitching and decoration, and shows how the supplier communicates. With us a sample can be a single piece, paid in advance, and the fee is credited against a first bulk order of 50 or more pieces.

Get a Quote

Sources

This guide makes no external factual claims. It relies on our own pages and guides, each of which carries its own dated sources where it states a duty, tax or standard.

Planning an order?

Send your brief and we will reply with pricing and a sample timeline.

Sample 8–10 working daysBulk 15–18 working daysTeam kits from 15, other styles 20 per style per colorA quote is not an order